Add a `duration` field to job finishing log line
Extend the log line
Job succeeded" job=1234 project=1234 runner=abcd1234
with a duration
field that shows how long the job was executed.
Extend the log line
Job succeeded" job=1234 project=1234 runner=abcd1234
with a duration
field that shows how long the job was executed.