Time label is misleading on the job details page
🧩 Problem
Time duration for pipelines and jobs are conveyed using multiple terminologies on the pipeline index and job detail pages. In #327109 (closed) we change Timing
to Duration
to be consistent for both the pipelines page and the jobs index page.
On the pipeline page Duration
time appears after pipeline concludes, but on job detail page it gets updates as job progresses and the label "Duration" may imply total run time. This could cause confusion as this time changes while the job is still running.
📑 Background
Proposal
On job details page, replace Duration
label to avoid implying value is total time for a completed job.
Edited by Thao Yeager