Generate a report containing issues that were moved from an expired milestone
In addition to bulk moving the issues, we should generate a report that captures all the issues that were moved.
Similar to how the infrastructure team has a summary report of the things that are done. https://gitlab.com/gitlab-com/gl-infra/infrastructure/issues/5900
We should generate an issue that contains the list of issues and merge request that were moved.
After we move all the issues and merge requests from %11.6 all the remaining open issues and merge requests in https://gitlab.com/groups/gitlab-org/-/milestones/21 will be zero. It would be difficult to look up this list again since the filter on %11.6 milestone will no longer work (the bulk of them are now in 11.8).
@jarv @andrewn can you please share that you folks use to build the above report in infrastructure. We would like to piggy back and see how we can adapt it to capture left overwork in milestones.
Thanks @dennis for raising this awareness in gitlab-com/www-gitlab-com#3555 (comment 130311449)