Group name change: Create:Editor to Create:IDE
Summary
This template is for the following types of label changes
- Adding a new Stage or Group
- Renaming an existing Stage or Group
For every case above, the Engineering Productivity team needs to ensure that:
- The label change is factored into the triage mechanism with updated spec fixtures.
- Old labels are migrated correctly on affected issues and merge requests.
Action items
-
(If applicable) Dashboard creation: create or update the stage/group in https://gitlab.com/gitlab-org/gitlab-insights/blob/master/lib/gitlab_insights.rb. -
(If applicable) Label migration on existing issues and merge requests: apply the new label to opened & closed issues, and open & merged merge requests. -
Check if label migration will apply labels which have subscribers. Communicate with the subscribers before applying the label migration.
-
-
(If applicable) Archive the old label with renaming and adding "DEPRECATED" at the end of the label name. -
(If applicable) Delete the old dashboard views using the deprecated labels. -
(If applicable) Update the group triage report definition to use the new label. -
(If applicable) Update the group label's description to refer to the new Stage.
/cc @gl-quality/eng-prod @gitlab-org/quality/engineering-analytics