Update Engineering offsite with more details
Why is this change being made?
Three changes, mostly unrelated to each other:
- Add a link to the agenda for the FY23 Q1 offsite.
- Move succession planning to every six months (every two offsites), per @rtakken.
- Suggest, but don't require, GitLab epics to track actions from the FY direction for each department.
Author Checklist
-
Provided a concise title for the MR -
Added a description to this MR explaining the reasons for the proposed change, per say-why-not-just-what - Copy/paste the Slack conversation to document it for later, or upload screenshots. Verify that no confidential data is added.
-
Assign reviewers for this change to the correct DRI(s) - If the DRI for the page/s being updated isn’t immediately clear, then assign it to one of the people listed in the "Maintained by" section in on the page being edited.
- If your manager does not have merge rights, please ask someone to merge it AFTER it has been approved by your manager in #mr-buddies.