Updating date to March 21 for the move
Why is this change being made?
Updating the Cloudflare blogpost with a date. Plan is to then announce on status.io and tweet with date and link back to blog post.
Does this MR meet the acceptance criteria?
Assign to DRI
-
Did you assign this change to the correct DRI of the page or information you are changing?
Conformity
-
Added description to this MR explaining the reasons for the proposed change, per say-why-not-just-what