Move the addition of Ready label to the main checklist for review
Why is this change being made?
Move the addition of the Ready label up in to the review list for the PM
Does this MR meet the acceptance criteria?
Assign to DRI
-
Did you assign this change to the correct DRI of the page or information you are changing?
Conformity
-
Added description to this MR explaining the reasons for the proposed change, per say-why-not-just-what
Edited by Keanon O'Keefe