Skip to content

Draft: Prepare 14.0.8 release

GitLab Release Tools Bot requested to merge 14-0-stable-patch-8 into 14-0-stable

Release issue: gitlab-org/release/tasks#2812 (closed)

Summary

This MR prepares 14-0-stable for 14.0.8.

Automated cherry-picking

Merge requests labeled Pick into 14.0 should be automatically picked into this MR using the following ChatOps command:

# In Slack
/chatops run release merge 14.0.8

Manual intervention

If merge requests cannot be picked automatically they have to be created manually targeting 14-0-stable-patch-8.


See also Patch Releases documentation.

Merge request reports

Loading