Parallelize internal_links and internal_anchors jobs in CI
Parallelize internal_links
and internal_anchors
commands in test_internal_links_and_anchors
job to make a pipeline faster.
Case | MR to generate a pipeline | Duration of the job | Job URL |
---|---|---|---|
before this MR | !1143 (closed) | 20:59 (1259 sec) | https://gitlab.com/gitlab-org/gitlab-docs/-/jobs/1161855165 |
with this MR | !1114 (merged) | 17:18 (1038 sec) | https://gitlab.com/gitlab-org/gitlab-docs/-/jobs/1161854649 |
=> 18 % faster (job duration)
Edited by Takuya Noguchi