Skip to content

Fix division by zero for blame age map

What does this MR do?

Fixes a division by zero error when the project is less than 1 day old.

Are there points in the code the reviewer needs to double check?

None.

Why was this MR needed?

Viewing blame page on project less than 1 day old results in error.

Does this MR meet the acceptance criteria?

What are the relevant issue numbers?

Closes #35441 (closed)

Edited by Jeff Stubler

Merge request reports

Loading