Skip to content

Hides pipeline duration in commit box when it is zero (nil)

What does this MR do?

Hides the duration info when the last pipeline has no duration.

Why was this MR needed?

@EvgenyOrekhov pointed in #32788 (closed) that GitLab was showing Pipeline ... running in 0 seconds.

Does this MR meet the acceptance criteria?

What are the relevant issue numbers?

Closes #32788 (closed).

Edited by Grzegorz Bizon

Merge request reports

Loading