WIP: Prepare 11.10.0-rc2-ee release
Release issue: gitlab-org/release/tasks#730 (closed)
Summary
This MR prepares 11-10-stable-ee
for 11.10.0-rc2-ee
.
Automated cherry-picking
Merge requests labeled ~"Pick into 11.10" should be automatically picked into both the CE and EE prepration MRs using the following ChatOps command:
# In Slack
/chatops run release merge 11.10.0-rc2
Once automated cherry-picking has completed, the CE merge request still needs to be merged into this merge request in order to bring in changes that are not EE-specific.
Refer to the documentation for more information.