Change "specific" runner to "project" in specs
What does this MR do and why?
Part of #387378 (closed)
This change renames old occurrences of "specific" when referring to runners, to update them to "project" in QA and other spec files.
Screenshots or screen recordings
NA
How to set up and validate locally
NA, changes are verified by the pipeline.
MR acceptance checklist
This checklist encourages us to confirm any changes have been analyzed to reduce risks in quality, performance, reliability, security, and maintainability.
-
I have evaluated the MR acceptance checklist for this MR.
Related to #387378 (closed)
Edited by Miguel Rincon