Skip to content

Follow-up from JobToken::RemoveProject GraphQL changes

drew stachon requested to merge token-scope-remove-project-followup into master

What does this MR do and why?

This MR adds a few new changes to address the non-blocking points that came up in review of !110669 (merged).

The changes are separated into individual commits, with explanatory commit messages on each.

Fixes #390686 (closed)

How to set up and validate locally

  • As these changes are internal refactors with adequate or increasing test coverage, specs can be used to validate this MR.

MR acceptance checklist

This checklist encourages us to confirm any changes have been analyzed to reduce risks in quality, performance, reliability, security, and maintainability.

Merge request reports

Loading