Skip to content

Adjust notifications for package-and-test failures

Mayra Cabrera requested to merge adjust-notification-for-package-and-test into master

What does this MR do and why?

The package-and-test CI configuration was modified to succeed even with test failures. This commit updates the Api::GetPackageAndTest to consider the downstream pipeline detailed status along with the bridge status.

I've performed two manual tests for this:

MR acceptance checklist

This checklist encourages us to confirm any changes have been analyzed to reduce risks in quality, performance, reliability, security, and maintainability.

Edited by Mayra Cabrera

Merge request reports

Loading