Skip to content

RuboCop: Remove "grace period" for from TODOs older than 2 weeks

Peter Leitzen requested to merge pl-remove-grace-period into master

What does this MR do and why?

As per https://docs.gitlab.com/ee/development/rubocop_development_guide.html#cop-grace-period this MR removes the "grace period" for RuboCop TODOs which were added longer than 2 week ago.

Done via:

sed -i '/Details: grace period/d' $(git log --name-only --format= -S "Details: grace period" --until "2 weeks ago" .rubocop_todo)

MR acceptance checklist

This checklist encourages us to confirm any changes have been analyzed to reduce risks in quality, performance, reliability, security, and maintainability.

Edited by Peter Leitzen

Merge request reports

Loading