Remote Dev: Prevent update of terminated workspaces
Issue: Add validation preventing desired_state change ... (#409773 - closed)
What does this MR do and why?
Implements Add validation preventing desired_state change ... (#409773 - closed)
Remote Dev: Prevent update of terminated workspaces
- desired_state cannot be updated for terminated workspaces
Screenshots or screen recordings
Result of GraphQL mutation, showing error message:
mutation workspaceUpdate($workspaceId: RemoteDevelopmentWorkspaceID!) {
workspaceUpdate(
input: {id: $workspaceId, desiredState: "Running"}
) {
clientMutationId
workspace {
id
name
url
desiredState
actualState
editor
maxHoursBeforeTermination
devfile
deploymentResourceVersion
}
errors
}
}
{
"data": {
"workspaceUpdate": {
"clientMutationId": null,
"workspace": null,
"errors": [
"Workspace update failed: Desired state is 'Terminated', and cannot be updated. Create a new workspace instead."
]
}
}
}
How to set up and validate locally
Run mutation as shown above in GraphiQL for a terminated workspace.
MR acceptance checklist
This checklist encourages us to confirm any changes have been analyzed to reduce risks in quality, performance, reliability, security, and maintainability.
-
I have evaluated the MR acceptance checklist for this MR.