Draft refactoring plan for modularization
What does this MR do and why?
Related to Create Working Group to identify the bounded co... (#423276 - closed)
These changes are extracted from #423276 (comment 1556887783).
The goal of this MR is to outline a possible iteration plan for refactoring the monolith into Packwerk packages. It does not specify a lot of details yet since some of these will be clarified by the Working Group. However, it describes expectations along each phase.
Screenshots or screen recordings
Screenshots are required for UI changes, and strongly recommended for all other merge requests.
Before | After |
---|---|
How to set up and validate locally
Numbered steps to set up and validate the change are strongly suggested.
MR acceptance checklist
This checklist encourages us to confirm any changes have been analyzed to reduce risks in quality, performance, reliability, security, and maintainability.
-
I have evaluated the MR acceptance checklist for this MR.
Edited by Grzegorz Bizon