Skip to content

Updated openjdk version to 8 from 7

Sara Ahbabou requested to merge update-openjdk-version into master

What does this MR do?

Minor change to update openjdk-7 to openjdk-8 in PlanUML Instructions

openjdk-7 was removed from Ubuntu 16.4. Unless users install openjdk-8 instead of openjdk-7, they will see this error:

Package openjdk-7-jdk is not available, but is referred to by another package.
This may mean that the package is missing, has been obsoleted, or
is only available from another source

E: Package 'openjdk-7-jdk' has no installation candidate

Related issues

ZD Ticket https://gitlab.zendesk.com/agent/tickets/122120

Author's checklist

  • Follow the Documentation Guidelines and Style Guide.
  • Link docs to and from the higher-level index page, plus other related docs where helpful.
  • Apply the ~Documentation label.

Review checklist

All reviewers can help ensure accuracy, clarity, completeness, and adherence to the Documentation Guidelines and Style Guide.

1. Primary Reviewer

  • Review by a code reviewer or other selected colleague to confirm accuracy, clarity, and completeness. This can be skipped for minor fixes without substantive content changes.

2. Technical Writer

  • Optional: Technical writer review. If not requested for this MR, must be scheduled post-merge. To request for this MR, assign the writer listed for the applicable DevOps stage.

3. Maintainer

  1. Review by assigned maintainer, who can always request/require the above reviews. Maintainer's review can occur before or after a technical writer review.
  2. Ensure a release milestone is set and that you merge the equivalent EE MR before the CE MR if both exist.
  3. If there has not been a technical writer review, create an issue for one using the Doc Review template.

Merge request reports

Loading