Draft: Move rolledup dates logic to backend
What does this MR do and why?
Move rolledup dates logic to backend
To avoid confusion about the rolled up dates behavior and ensure we have the same results through the API and in the UI, we decided to move the logic regarding when to use the fixed dates or the rolled up to the backend.
Related to: #480568 (closed)
MR acceptance checklist
Please evaluate this MR against the MR acceptance checklist. It helps you analyze changes to reduce risks in quality, performance, reliability, security, and maintainability.
Screenshots or screen recordings
Screenshots are required for UI changes, and strongly recommended for all other merge requests.
Before | After |
---|---|
How to set up and validate locally
Numbered steps to set up and validate the change are strongly suggested.