Backport missing project_id for build_chat_data
What does this MR do and why?
!167729 (merged) was actually released in %17.5: https://ops.gitlab.net/gitlab-com/chatops/-/jobs/15987603 so we need to backport the fix: !169927 (merged)
We also backport !169559 (diffs) to fix the pipeline: https://gitlab.com/gitlab-org/gitlab/-/jobs/8324961644
MR acceptance checklist
This checklist encourages us to confirm any changes have been analyzed to reduce risks in quality, performance, reliability, security, and maintainability.
-
This MR is backporting a bug fix, documentation update, or spec fix, previously merged in the default branch. -
The MR that fixed the bug on the default branch has been deployed to GitLab.com (not applicable for documentation or spec changes). -
This MR has a severity label assigned (if applicable). -
Set the milestone of the merge request to match the target backport branch version. -
This MR has been approved by a maintainer (only one approval is required). -
Ensure the e2e:test-on-omnibus-ee
job has either succeeded or been approved by a Software Engineer in Test.
Note to the merge request author and maintainer
If you have questions about the patch release process, please:
- Refer to the patch release runbook for engineers and maintainers for guidance.
- Ask questions on the
#releases
Slack channel (internal only).
Edited by Marius Bobin