Skip to content

Change Gitaly recommendations for 25k and 50k architectures in the docs

Tanya Pazitny requested to merge tp-x-gitaly-nodes into master

What does this MR do?

This MR changes the recommendations for Gitaly to slightly more generic terms and recommends a review of the data in order to decide on an appropriate number of nodes.

Related issues

Author's checklist

Review checklist

All reviewers can help ensure accuracy, clarity, completeness, and adherence to the Documentation Guidelines and Style Guide.

1. Primary Reviewer

  • Review by a code reviewer or other selected colleague to confirm accuracy, clarity, and completeness. This can be skipped for minor fixes without substantive content changes.

2. Technical Writer

  • Optional: Technical writer review. If not requested for this MR, must be scheduled post-merge. To request for this MR, assign the writer listed for the applicable DevOps stage.

3. Maintainer

  1. Review by assigned maintainer, who can always request/require the above reviews. Maintainer's review can occur before or after a technical writer review.
  2. Ensure a release milestone is set and that you merge the equivalent EE MR before the CE MR if both exist.
  3. If there has not been a technical writer review, create an issue for one using the Doc Review template.

Merge request reports

Loading