Migrate note edited text spec to vue-test-utils
Title: Prepare note edited text for bv upgrade
This MR lays the groundwork for the BootstrapVue upgrade that will be done in this MR: !18913 (merged). Due to some changes in the BTooltip and BPopover components, some related tests started failing after the upgrade. Those tests need to be updated accordingly:
- Migrate specs to use vue-test-utils
-
sync
needs to be set tofalse
-
attachToDocument
must betrue
This MR focuses on upgrading the tests located in spec/frontend/notes/components/note_edited_text
:
Why are these changes necessary?
- The reason to migrate the tests to
vue-test-utils
is that it allows us to set thesync
andattachToDocument
properties. - The reason to set
attachDocument
totrue
is that the BTooltip and BPopover directives expect to be attached to a document object. - The reason to set
sync
tofalse
is that otherwise, specs for components that useBTooltip
orBPopover
will fail with the following error:
TypeError: Cannot read property 'sync' of null
Screenshots
Does this MR meet the acceptance criteria?
Conformity
- [-] Changelog entry
- [-] Documentation (if required)
-
Code review guidelines - [-] Merge request performance guidelines
-
Style guides - [-] Database guides
- [-] Separation of EE specific content