Ci resource group status transition (v2)
What does this MR do?
This MR is re-architecting !20903 (closed) with the proposal
Manual QA: Mon Dec 23 07:31:22 UTC 2019
.gitlab-ci.yml
test:
script: echo 'a'
resource_group: iOS
test
job
Case: When there is one - Expectation: Users should see a running
test
job - Result: Pass
test
jobs
Case: When there are two - Expectation: Users should see a running and waiting
test
jobs - Result: Pass
test
job was canceled
Case: When the first - Expectation: Users should see the second
test
job is pending - Result: Pass
test
job succeeded
Case: When the second - Expectation: Users should see the second
test
job succeeded - Result: Pass
Screenshots
Does this MR meet the acceptance criteria?
Conformity
-
Changelog entry - [-] Documentation (if required)
-
Code review guidelines -
Merge request performance guidelines -
Style guides -
Database guides -
Separation of EE specific content
Availability and Testing
-
Review and add/update tests for this feature/bug. Consider all test levels. See the Test Planning Process. - [-] Tested in all supported browsers
Security
If this MR contains changes to processing or storing of credentials or tokens, authorization and authentication methods and other items described in the security review guidelines:
- [-] Label as security and @ mention
@gitlab-com/gl-security/appsec
- [-] The MR includes necessary changes to maintain consistency between UI, API, email, or other methods
- [-] Security reports checked/validated by a reviewer from the AppSec team
Edited by Shinya Maeda