Skip to content

De-quarantine previously failing pipeline spec

Dan Davison requested to merge qa-dequarantine-pipeline-smoke-test into master

What does this MR do?

De-quarantines the previously failing spec within create_and_process_pipeline_spec.rb.

This test was failing on staging initially due to improper waits. Two separate fixes were merged in an attempt to remedy

Passes:

Closes #202149 (closed)

Does this MR meet the acceptance criteria?

Conformity

Merge request reports

Loading