Doc changes for updates to default project deletion behavior
What does this MR do?
This MR adds the documentation changes for the updates made to the default deletion of Projects.
Currently, all projects on Premium or Silver or higher tiers are deleted after a delayed period.
In #220382 (closed), we made this configurable at the Group Setting level. This MR documents the changes to this behavior.
Mentions #220382 (closed)
Screenshots
Does this MR meet the acceptance criteria?
Conformity
-
Changelog entry -
Documentation (if required) -
Code review guidelines -
Merge request performance guidelines -
Style guides -
Database guides -
Separation of EE specific content
Availability and Testing
-
Review and add/update tests for this feature/bug. Consider all test levels. See the Test Planning Process. -
Tested in all supported browsers -
Informed Infrastructure department of a default or new setting change, if applicable per definition of done
Security
If this MR contains changes to processing or storing of credentials or tokens, authorization and authentication methods and other items described in the security review guidelines:
-
Label as security and @ mention @gitlab-com/gl-security/appsec
-
The MR includes necessary changes to maintain consistency between UI, API, email, or other methods -
Security reports checked/validated by a reviewer from the AppSec team
Edited by Aishwarya Subramanian