Skip to content

Update Jira integration images

Mike Lewis requested to merge update-jira-integration-images into master

What does this MR do?

Updates the Jira issues list screenshot with one provided by UX and also removes an outdated settings screenshot which is not helpful enough to be worth updating.

Related issues

!36435 (merged)

Author's checklist (required)

Do not add the feature, frontend, backend, ~"bug", or database labels if you are only updating documentation. These labels will cause the MR to be added to code verification QA issues.

When applicable:

Review checklist

All reviewers can help ensure accuracy, clarity, completeness, and adherence to the Documentation Guidelines and Style Guide.

1. Primary Reviewer

  • Review by a code reviewer or other selected colleague to confirm accuracy, clarity, and completeness. This can be skipped for minor fixes without substantive content changes.

2. Technical Writer

  • Technical writer review. If not requested for this MR, must be scheduled post-merge. To request for this MR, assign the writer listed for the applicable DevOps stage.

3. Maintainer

  1. Review by assigned maintainer, who can always request/require the above reviews. Maintainer's review can occur before or after a technical writer review.
  2. Ensure a release milestone is set.
  3. If there has not been a technical writer review, create an issue for one using the Doc Review template.
Edited by Mike Lewis

Merge request reports

Loading