Stablize transfer project spec by waiting for confirm button enabled
What does this MR do?
Stablizes transfer project spec by waiting for confirm button enabled
Closes: #218302 (closed)
Conformity
- [-] Changelog entry
- [-] Documentation (if required)
-
Code review guidelines - [-] Merge request performance guidelines
-
Style guides - [-] Database guides
- [-] Separation of EE specific content
Security
If this MR contains changes to processing or storing of credentials or tokens, authorization and authentication methods and other items described in the security review guidelines:
- [-] Label as security and @ mention
@gitlab-com/gl-security/appsec
- [-] The MR includes necessary changes to maintain consistency between UI, API, email, or other methods
- [-] Security reports checked/validated by a reviewer from the AppSec team
Edited by Sanad Liaquat