Sort and link projects in coverage table
What does this MR do?
Related to &2838 (closed)
Fixing the following:
- Sort the coverage data table by the most recent updated report.
- Link the project in the table to the project report.
- Exclude the projects with no coverage from the table.
This feature is behind a feature flag and does not need a changelog entry.
Screenshots (strongly suggested)
Before | After |
---|---|
Does this MR meet the acceptance criteria?
Conformity
- [-] Changelog entry
- [-] Documentation (if required)
-
Code review guidelines -
Merge request performance guidelines - [-] Style guides
- [-] Database guides
-
Separation of EE specific content
Availability and Testing
-
Review and add/update tests for this feature/bug. Consider all test levels. See the Test Planning Process. - [-] Tested in all supported browsers
- [-] Informed Infrastructure department of a default or new setting change, if applicable per definition of done
Edited by Scott Hampton