Skip to content

Adjust the development pipeline guideline for postgres

Kyle Wiebers requested to merge kwiebers-master-patch-59575 into master

What does this MR do?

The upgrade pg12 issue was delayed to %13.7, this change updates the guidelines and directs to the issue for reference.

Does this MR meet the acceptance criteria?

Conformity

Availability and Testing

Security

If this MR contains changes to processing or storing of credentials or tokens, authorization and authentication methods and other items described in the security review guidelines:

  • Label as security and @ mention @gitlab-com/gl-security/appsec
  • The MR includes necessary changes to maintain consistency between UI, API, email, or other methods
  • Security reports checked/validated by a reviewer from the AppSec team

Merge request reports

Loading