Skip to content

Make milestone a string in metrics schema

Balasankar 'Balu' C requested to merge fix-metric-schema into master

What does this MR do?

Without this change, milestones will be considered a number, and the trailing 0 (for example in 13.10) will be dropped (and hence result in the milestone being considered 13.1, which is wrong).

Does this MR meet the acceptance criteria?

Conformity

Availability and Testing

Edited by Balasankar 'Balu' C

Merge request reports

Loading