Add project-level DORA lead time graphs
What does this MR do?
Adds project-level DORA 4 lead time graphs as described in #250329 (closed).
This is very similar to the deployment frequency graphs added in !50885 (merged).
Screenshots
When hovering over an area of the chart that has data:
When hovering over an area of the chart that does not have data:
GIF:
👣
Steps - !58442 (merged)
- !58708 (merged)
- !57872 (merged) (this MR)
Related to #250329 (closed)
Edited by Nathan Friend