Draft: [POC - project-group consolidation] migrate epics to shadow project - step1
What does this MR do?
Related to !54792 (merged)
- creates shadow project for each group (this shadow project is used only internally to migrate resources from group to the project, in the last phase this shadow project will replace the group)
- adds parent reference to projects (used only for shadow projects)
- updates epics to reference these shadow projects
- updates models/finder to return epics which reference either group or group's shadow project (so in the next phase we can drop epic's group reference)
Screenshots (strongly suggested)
Does this MR meet the acceptance criteria?
Conformity
-
📋 Does this MR need a changelog?-
I have included a changelog entry. -
I have not included a changelog entry because _____.
-
-
Documentation (if required) -
Code review guidelines -
Merge request performance guidelines -
Style guides -
Database guides -
Separation of EE specific content
Availability and Testing
-
Review and add/update tests for this feature/bug. Consider all test levels. See the Test Planning Process. -
Tested in all supported browsers -
Informed Infrastructure department of a default or new setting change, if applicable per definition of done
Security
If this MR contains changes to processing or storing of credentials or tokens, authorization and authentication methods and other items described in the security review guidelines:
-
Label as security and @ mention @gitlab-com/gl-security/appsec
-
The MR includes necessary changes to maintain consistency between UI, API, email, or other methods -
Security reports checked/validated by a reviewer from the AppSec team
Edited by Jan Provaznik