Handle ProjectNamespaces when transfering a project or a group
What does this MR do and why?
Keeps a project's associated project_namespace record in sync on path
, name
, parent
and visibility_level
with project's changes.
This does not handle routes changes yet. That is going to be handled as part of #337103 (closed) which currently has a couple POCs in works: !69702 (closed), !70769 (closed), !67664 (closed)
Describe in detail what your merge request does and why.
Screenshots or screen recordings
These are strongly recommended to assist reviewers and reduce the time to merge your change.
How to set up and validate locally
Numbered steps to set up and validate the change are strongly suggested.
MR acceptance checklist
This checklist encourages us to confirm any changes have been analyzed to reduce risks in quality, performance, reliability, security, and maintainability.
-
I have evaluated the MR acceptance checklist for this MR.
Related to #340491 (closed)
Edited by Alexandru Croitor