Fix flaky spec on seat link cron
What does this MR do and why?
In !75468 (merged) we increase seat link cron window to be between 3-4 hours, however we forgot to update the spec.
MR acceptance checklist
This checklist encourages us to confirm any changes have been analyzed to reduce risks in quality, performance, reliability, security, and maintainability.
-
I have evaluated the MR acceptance checklist for this MR.