Docs: Update image for group level VSA stage table
What does this MR do and why?
Updates the screenshot for the group level VSA stage table to include the project path. Introduced in #215290 (closed)
How to set up and validate locally
Numbered steps to set up and validate the change are strongly suggested.
MR acceptance checklist
This checklist encourages us to confirm any changes have been analyzed to reduce risks in quality, performance, reliability, security, and maintainability.
-
I have evaluated the MR acceptance checklist for this MR.