Skip to content

Move "Create an MR" text to different line

Jonathan Schafer requested to merge add-period-after-solution into master

What does this MR do and why?

This MR adds new line after the solution to move the text about creating an MR in the Vulnerability Solution to a different section.

Screenshots or screen recordings

This is how it was:

Screen_Shot_2022-05-13_at_4.05.21_PM

This is how it is now:

Screen_Shot_2022-05-18_at_11.23.04_AM

How to set up and validate locally

Numbered steps to set up and validate the change are strongly suggested.

MR acceptance checklist

This checklist encourages us to confirm any changes have been analyzed to reduce risks in quality, performance, reliability, security, and maintainability.

Edited by Jonathan Schafer

Merge request reports

Loading