Include bridge jobs for duration calculation
What does this MR do and why?
Related to #356759 (closed)
Include bridge jobs for duration calculation. As there might be some long running bridge jobs for downstream pipelines, we need to take the bridge jobs into consideration as well.
MR acceptance checklist
This checklist encourages us to confirm any changes have been analyzed to reduce risks in quality, performance, reliability, security, and maintainability.
-
I have evaluated the MR acceptance checklist for this MR.
Edited by Tianwen Chen