Add Scheduled badge to pipeline detail view
What does this MR do and why?
This adds the Scheduled
badge to the pipeline detail page
Screenshots or screen recordings
Pipeline detail view | Pipeline overview |
---|---|
How to set up and validate locally
Just create a schedule, play it and visit the detail view of the triggered pipeline
MR acceptance checklist
This checklist encourages us to confirm any changes have been analyzed to reduce risks in quality, performance, reliability, security, and maintainability.
-
I have evaluated the MR acceptance checklist for this MR.
Relates to #375222 (closed)