Update VSA date range tooltip text
What does this MR do and why?
Updates the text in the tooltip to reflect the content the table now displays:
Before: Showing data for workflow items created in this date range. Date range limited to 180 days.
After: Showing data for workflow items completed in this date range. Date range limited to 180 days.
Screenshots or screen recordings
Before | After |
---|---|
How to set up and validate locally
- Navigate to value stream analytics for any project
- Hover over the tooltip next to the date range selector
MR acceptance checklist
This checklist encourages us to confirm any changes have been analyzed to reduce risks in quality, performance, reliability, security, and maintainability.
-
I have evaluated the MR acceptance checklist for this MR.
Related to #368302 (closed)
Edited by Ezekiel Kigbo