Skip to content

Fix date dependent spec with useFakeDate

Paul Slaughter requested to merge ps-fix-13-8-date-dependent-spec into 13-8-stable-ee

What does this MR do?

There's a date dependent spec which is failing 13-8-stable-ee pipelines and blocking backport MR's.

Merge request reports

Loading